Skip to main content

MHIC #117311 · Maryland Service Area

Bathroom Remodeling in Maryland — MHIC #117311

From Bethesda colonials to Annapolis waterfront homes, our team has been remodeling Maryland bathrooms since 2005. Every project — primary suite, hall bath, half bath, basement powder — gets the same in-house craftsmanship, fixed-price quote, and 5-year workmanship warranty.

Investment$22,000 – $48,000
Timeline5–7 weeks
Warranty5-year
Bathroom Remodeling project by Eagle Home Improvements

Pricing

Bathroom Remodeling cost in Maryland (2026)

ScopeInvestment rangeIncludes
Designer refresh$8,500 – $18,000Premium vanity, designer fixtures, custom paint, statement lighting, mirror, hardware. Same footprint.
Half / powder bath$15,000 – $22,000Full surface replacement, premium toilet and vanity, custom tile and lighting.
Standard full bath$22,000 – $38,000New walk-in shower or freestanding tub, designer tile, vanity, fixtures, lighting, ventilation.
Primary suite remodel$38,000 – $65,000Walk-in shower with bench, double vanity, freestanding tub, heated floor, custom storage.
Luxury / full gut$65,000 – $125,000+Custom millwork, stone slabs, steam shower, smart fixtures, full layout reconfiguration.

Ranges reflect Maryland market conditions for 2026. Final price depends on county labor rates, fixture grade, and structural complexity. Free fixed-price quote after one in-home visit.

Process

How an Eagle Home Improvements bathroom remodeling project unfolds

  1. 01

    In-home consultation

    Walk-through, scope review, lifestyle questions, rough budget alignment. 60–90 minutes, free.

  2. 02

    Design & material selection

    3D renderings, tile samples, fixture brands, finish board. You see and touch every choice before signing.

  3. 03

    Fixed-price agreement

    No hourly billing. Line-item itemization, payment schedule, change-order policy in writing.

  4. 04

    Permits & lead times

    We pull every county permit (Montgomery, Howard, Anne Arundel, Baltimore, Frederick, Prince George's) and order materials before demo.

  5. 05

    Build

    Daily clean-up, single foreman, photo updates, plastic floor protection. Bathroom is unusable on average 14–18 days.

  6. 06

    Quality walk + warranty

    Punch list, county final inspection, signed warranty (5-year workmanship + manufacturer fixture warranties).

Materials we use

Trusted brands across every bathroom remodeling project

  • Kohler
  • Moen
  • Delta
  • Toto
  • Daltile
  • MSI
  • Quartz countertops
  • Solid wood vanities
  • Schluter waterproofing
  • Dryer-vented exhaust fans

Permits & code

Maryland permits we handle

Bathroom remodels involving plumbing relocation, electrical updates, or structural changes require a permit in every Maryland jurisdiction we serve. We file permits in Montgomery, Howard, Anne Arundel, Baltimore County, Baltimore City, Prince George's, Frederick, Carroll, and Charles counties on your behalf — and coordinate every inspection.

Warranty

5-year workmanship

5-year workmanship warranty plus manufacturer warranties on every fixture, tile, and finish. Documented in writing at project close.

Sub-services for bathroom remodeling

Every bathroom remodeling sub-service we offer in Maryland

Eagle Home Improvements handles every variation of bathroom remodeling — from quick refreshes to full custom builds. MD-specific notes flag county code, climate, or market considerations for each.

  • Tub-to-walk-in shower conversion

    Remove old tub, build curbless walk-in shower with bench, glass enclosure, and waterproofing membrane.

    MD note: Most common request in MD aging-in-place renovations. Permit required statewide.

  • Primary suite spa bath

    Walk-in shower + freestanding tub + double vanity + heated floor + custom storage tower.

    MD note: Bethesda, Potomac markets — $40K-$80K typical. Larger MD lots accommodate dual showerheads.

  • Half / powder bath redesign

    New vanity, toilet, tile, lighting, and statement wallpaper or paint in same footprint.

    MD note: Common ROI play in Annapolis Historic and Roland Park rowhomes — period-correct fixtures available.

  • Aging-in-place bathroom

    Curbless shower, grab-bar reinforcement, comfort-height toilet, lever handles, anti-slip tile.

    MD note: Maryland Older Adults Tax Credit reimburses portion of accessibility upgrades. We document scope for credit eligibility.

  • Basement bathroom addition (with sewage ejector)

    Adding full bath below sewer line — sewage ejector pump, tile, fixtures, lighting, ventilation.

    MD note: Common in MD finished-basement projects. Adds $14K–$22K to scope. Always permitted.

  • Heated tile floor (radiant electric)

    Electric radiant heat under tile for spa-grade comfort. Add-on to any full bath remodel.

    MD note: Comfort upgrade for cold MD tile-floor mornings. Adds $1,500-$2,500 typical.

  • Period-correct bathroom restoration (historic)

    Reproduction subway tile, period brass fixtures, plaster wall restoration, and matching trim profiles.

    MD note: Annapolis HPC, Roland Park, Old Town Alexandria homes. We source historically accurate materials.

  • Steam shower installation

    Sealed shower enclosure with steam generator, vapor-tight glass, ceiling slope, and bench.

    MD note: Premium add — $8K-$15K incremental over standard shower. Popular in Bethesda primary baths.

Maintenance — keep it perfect

How to maintain your bathroom remodeling in Maryland

MD climate (humid summers, freeze-thaw winters, high pollen) is harder on finishes than coastal CA or arid SW. These tips extend the life of your investment by years.

  • Every 18-24 months

    Re-caulk shower perimeter every 18-24 months

    Remove old silicone, scrub mold, dry 24 hours, apply new mildew-resistant 100% silicone. Avoid acrylic.

  • Every 5-7 years

    Re-grout grout lines every 5-7 years

    Remove top 2-3mm of grout with grout saw, vacuum clean, apply new grout color-matched to existing.

  • Every shower

    Run exhaust fan 20 minutes after every shower

    Hard-wired fan with 30-minute timer eliminates the "did I leave it on?" question. Critical for MD humidity.

  • Annual

    Seal natural stone counters annually

    Apply penetrating sealer (Aquamix, Stone Care), let dwell 5 minutes, buff dry. Quartz does not need sealing.

  • Quarterly

    Inspect shower drain and overflow

    Remove drain cover, clear hair and soap scum. Check overflow plate gasket for cracks.

  • Annual

    Tighten faucet handles + spout connections

    Faucets loosen with use. Tighten setscrews or compression nuts seasonally to prevent micro-leaks.

FAQ

Frequently asked questions about bathroom remodeling in Maryland

How much does a bathroom remodel cost in Maryland in 2026?

Most full Maryland bathroom remodels cost $15,000–$35,000 in 2026. Cosmetic refreshes start around $5,000; primary-suite or luxury work runs $35,000–$80,000+. Final price depends on scope, fixture grade, and county labor rates.

How long will my bathroom be unusable?

Plan for 14–18 days of unusable bathroom time within a 4–6 week project. We sequence demolition, rough plumbing/electric, and tile back-to-back to minimize displacement.

Do I need a permit for a bathroom remodel?

Yes — any plumbing relocation, electrical update, or structural change requires a permit in every MD county we serve. Eagle Home Improvements pulls every permit on your behalf.

Can you match historic homes in Bethesda or Annapolis?

Yes. We regularly work in 1920s–1960s Maryland homes and source period-appropriate tile, fixtures, and millwork while modernizing electrical and waterproofing to current code.

Do you offer financing?

Yes — 0% promotional financing is available for qualified Maryland homeowners through our partner lenders. Discussed at your free estimate.

Do you handle demolition and debris removal?

Yes. Demolition, disposal, and clean-up are included in every fixed-price quote. You will not need a separate dumpster or disposal service.

What's your warranty?

5-year workmanship warranty plus full manufacturer warranties on fixtures, tile, and surfaces. Signed at project completion.

Can you start within 2 weeks?

Typical wait from signed contract to demo day is 4–6 weeks (design + permits + material lead time). Emergency repair work can start faster.

Free In-Home Consultation

Ready for your bathroom remodeling in Maryland?

Free in-home estimate, fixed-price quote within 48 hours. MHIC #117311 · $2M general liability.